Cross Roads Middle School
Canopy
Lighting
|
|
The Old Canopy that was installed back in
the 70s, was replaced new 2010, we brought the electrical up to the NEC replaceing the old lighting and upsized the wiring
and added more lights, replaced all lighting with more energy efficient lights.
|
Underground Duct Bank
BMW Plant Sparpanburg
|
|
|
We installed a primary duct bank for the
plant, Duke Power use, moved 4 lights, added 2 more light poles, for the new plant entrance.
|