This Job was bid out to the lowest Electrical Contractor,
over 225 lights, the Electrical Contractor used a power driver to install these light fixtures, as you can see by picture
above, these shots did not take. The contracting General called South Eastern... for help to repair & reinstall
these fixture, Patricia, President of South Eastern Construction sent 3 crews and in just 3 days and no over time, and
before the USC students came back from break, walked off the job at Mcbryde USC and was completed on time, the lights were
drilled and 1"redheads where used to reinstall all fixtures.
PS: the Electrical Contractor went out of business.
|